Reliability or Tranche 2 includes the construction of a third Ore Operation Plant (OPP3), hydro-transport, sulphur unit 3 and a 5,000 barrels per day increase in production capacity by 2013. Directive 74 includes the installation of equipment and tailings process required to meet new Energy Resources Conservation Board (ERCB) regulations. As of December 2012, Tranche 2 is 86% complete and Directive 74 is 16% complete.