Freelancers using Web3.js in LagosFreelancers using Web3.js in Lagos
Design and Development Partner For Startups (A.I Powered)
    2x
    Hired
    5.0
    Rating
    121
    Followers
Design and Development Partner For Startups (A.I Powered)
Cover image for A prayer app that measures
A prayer app that measures presence, not streaks. Prayer Guide is a free daily-prayer companion: scripture, guided prayers, a focus timer, an encrypted journal, and people to pray with. Designed end to end and shipped to both stores. Role: Product design & build Platform: iOS & Android The problem Habit apps borrow their mechanics from fitness tracking: streaks, badges, notifications that escalate when you slip. Applied to prayer, those mechanics turn a practice into a performance, and a missed day into guilt. The other failure is privacy. People write their most vulnerable thoughts into a journal, and most apps store that text in plain sight. The approach Slow the interface down. One verse and one guided prayer a day, a timer that counts breaths rather than reps, and no red badge for a day you missed. Every feature is free, so nothing sits behind a paywall when someone needs it. The journal encrypts on the device before it syncs. Prayer requests stay readable only so they can be shared with a chosen companion. Outcome Live on both stores, free, with a thousand people praying daily https://prayerguide.thedigitalninjatech.com/
1
87
Cover image for Branding for a e-commerce chat
Branding for a e-commerce chat app. Logo Design, Animation, Brand Tone and Voice, Typography, Iconography, Colour Scheme, and brand guide.
0
136
Cover image for Recent Logo Animation and branding work for a travel agency...
Recent Logo Animation and branding work for a travel agency...
2
3
246
Product designer and No code Developer
    5.0
    Rating
    3
    Followers
Product designer and No code Developer
Nextjs & Supabase Expert | AI-Powered SaaS, Web3 | Intercom
Nextjs & Supabase Expert | AI-Powered SaaS, Web3 | Intercom
I’m a Shopify & WordPress Developer/Designer
New to Contra
I’m a Shopify & WordPress Developer/Designer
Cover image for Upstudy is a premium, fully
Upstudy is a premium, fully responsive Learning Management System (LMS) platform designed using WordPress. The core objective was to create a clean, modern, and highly engaging educational interface that organizes a massive directory of courses into an intuitive user journey, making online learning accessible and visually appealing. Key Features & Design Layout High-Engaging Hero Section: Features a dynamic lifestyle graphic paired with strong value proposition typography ("Best Platform to Empower Skills"). Includes trust signals like an interactive student enrollment counter (100K+) and a clear, high-contrast Call-to-Action (CTA) to drive immediate sign-ups. Grid-Based Category Directory: A clean, multi-colored grid section for "Top Categories" (Mathematics, Development, Email Marketing, IT/Technology, etc.) utilizing clear iconography to help users jump directly to their field of interest. Targeted Audience Split Banners: Implements customized pathways for different target user groups—specifically segmented for learning with an "Expert Teacher" or self-paced paths "For Individuals"—streamlining the onboarding experience. Dynamic Course Marketplace Grid: A feature-rich "Popular Courses" section with clear card layouts. Each card showcases category badges (Development, Language, Fitness), instructor avatars, lesson counts, ratings, pricing/free indicators, and an interactive wishlist feature. The Results A robust, highly intuitive educational hub engineered for minimal user friction. The platform seamlessly bridges clean typography with heavy-duty database management, giving the brand a professional corporate look while maximizing course enrollment and user retention.
0
54
Cover image for Artistic is a beautifully organized,
Artistic is a beautifully organized, feature-rich Shopify storefront tailored for an artisanal brand specializing in handmade crafts, pottery, and home decor. The core objective was to build an online marketplace that balances a warm, creative identity with heavy-duty e-commerce functionality, maximizing product visibility and conversions. Key Features & Design Layout Earth-Toned Artisan Hero Section: Utilizes a soft, neutral palette and minimalist product placement ("New Sell Handmade & Collection") to establish a warm, welcoming, and authentic craftsman feel immediately upon landing. Granular Category Carousel: Features an intuitive "Shop By Category" slider with clean square thumbnails (Architecture Art, Literature Art, Theater Art, Ceramics Art, Sculpture Art). It serves as a visual navigation map for extensive inventories without cluttering the screen. Asymmetrical Promotional Banner Grid: Implements a dynamic masonry-style layout highlighting multi-tiered promotions (Flat Discount 30%, 25% Discount, 35% Discount). This creates a structured yet visually engaging way to guide shoppers to seasonal collections. Direct-to-Cart Product Grid with Filter Tabs: A collection showcase equipped with quick-category tabs (Literature Art, Theater Art, Ceramics Art), product rating stars, and clear "Add To Cart" buttons beneath every item to significantly lower purchasing friction. Scarcity & Urgency "Deal Of The Day" Modules: Features dedicated promotional slots with live countdown timers (Days, Hrs, Min, Sec) and inventory scarcity indicators ("Hurry up! only 145 items left in stock!"). This uses psychological triggers to accelerate checkout decisions. The Results A robust, content-rich e-commerce store optimized for boutique brands with diverse inventories. By blending an authentic, earthy artisan layout with conversion-focused tools like scarcity timers and direct-to-cart functionality, the design transforms a portfolio-style site into a high-yield retail engine.
1
2
58
Cover image for Mojuri is an editorial-inspired Shopify
Mojuri is an editorial-inspired Shopify e-commerce store designed for a modern, high-end jewelry boutique. The design prioritizes a clean, lifestyle-focused layout that mimics a premium digital magazine, elevating the brand's perceived value and creating an immersive shopping experience. Key Features & Design Layout Editorial Hero Slider: Features an asymmetrical, organic composition using structured 3D elements, soft tropical greenery, and minimalist typography ("Jewelry For Every Day") to establish an instant luxury identity. Asymmetric Grid Navigation: A beautifully structured lifestyle gallery that serves as a visual directory for categories (Shop Rings, Shop Bracelets, Shop Necklaces, Shop Earrings, Shop Charm). This layout blends model photography with product shots to increase engagement. Curated Product Showcase: A clean product row titled "Everyday Elegance" focusing on whitespace and high-quality photography, complete with subtle, high-contrast discount badges to encourage clicks without disrupting the premium aesthetic. Interactive Brand Storytelling Section: A dedicated narrative block ("Beauty & Ingenuity") featuring tabbed navigation (Beauty & Ingenuity, Ear Stack Magic, Wristwear Essentials) that combines storytelling with direct shopping capabilities (CTA button) to build a deeper connection with consumers. The Results A sophisticated, high-end digital storefront tailored for lifestyle commerce. By replacing standard boxy layouts with dynamic, magazine-style grids, this storefront drives longer session times and enhances emotional design-to-purchase conversions.
1
2
69
Cover image for Jewelish is a premium, high-converting
Jewelish is a premium, high-converting Shopify e-commerce store designed for a luxury jewelry brand. The goal was to create a sophisticated, clean, and highly intuitive user interface that showcases delicate products while driving seamless user navigation and conversions. Key Features & Design Layout Premium Minimalist Hero Section: Features a high-resolution banner with subtle typography, clear calls-to-action (CTA), and a promotional top bar to instantly capture visitor attention. Visual Category Navigation: A clean "Popular Categories" grid utilizing circular product thumbnails to allow customers to easily browse specific collections (Brackets, Earrings, Engagement Rings, etc.) without clutter. Targeted Promotional Banners: Split grid banners highlighting specific collections ("Flutter & Butterfly Pendant" and "Best Gold Filled Bracelet") to drive traffic to high-margin products. Tabbed Dynamic Product Grid: A "Trending Products" section equipped with filter tabs (Featured, New Arrival, Best Seller) and clear sales badges to optimize product discovery and psychological urgency. Value Proposition Footer: Integrated trust badges featuring icon-driven markers for Worldwide Shipping, Easy 30-Day Returns, and a Money-Back Guarantee to build immediate buyer confidence. The Results A fully responsive, visually stunning jewelry store built with a focus on luxury aesthetics, optimized loading speeds, and a streamlined layout engineered to convert casual browsers into loyal customers.
0
47
Top 1% SAAS developer | Building and shipping with AI
Top 1% SAAS developer | Building and shipping with AI
Cover image for Redefining B2B SaaS Storefronts Through
Redefining B2B SaaS Storefronts Through Cinematic Architecture For Day 14 of my 30-day design sprint, I engineered LinkFlowā„¢ a bespoke, high-fidelity landing page concept designed for enterprise AI workflow automation and data orchestration platforms. In the high-ticket B2B software space, corporate buyers don't invest in tools based on flat utility alone; they look for security, speed, and modern architectural scaling. If a platform's frontend feels like an outdated template, trust vanishes and sales cycle velocity stalls. This interface system balances deep environmental depth with an intensely clean, minimalist editorial structure. By wrapping crisp, highly-spaced sans-serif typography tightly over a sprawling volumetric bridge landscape, the interface visually solves the company’s core value proposition: bridging the gap between disparate data signals and corporate action. The integration of floating glassmorphic navbars and structural micro-copy metrics projects exceptional design craftsmanship at a single glance, lifting conversion certainty for enterprise-level clients. Engineered natively via Google AI Studio and deployed on Vercel. Are you a venture-backed tech startup or software enterprise looking to elevate your market position and scale conversion velocity through next-generation web design? Let's connect here or via DM to reconstruct your digital flagship.
0
28
Cover image for When a product relies on
When a product relies on advanced engineering, generic e-commerce templates fail to convert. This project solves a specific client bottleneck: translating dense scientific preservation data into an intuitive, high-converting consumer interface. My Tactical Execution: Interactive Data Simulation: Engineered a custom timeline slider that lets users actively test material degradation, increasing on-site dwell time and purchase intent. Instant Value Justification: Designed an immediate visual contrast between standard failure states (10% retention) and the client’s proprietary tech (94% retention). Atmospheric Brand Alignment: Utilized premium dark mode glassmorphism to position the interface as an authoritative, luxury scientific tool. The Result: An interface that eliminates sales friction by letting the data defend the premium price point. Let’s turn your complex tech into a high-converting digital product. Click "Inquire" to start.
0
46
Cover image for Elevating Fashion E-commerce Architecture for
Elevating Fashion E-commerce Architecture for Luxury and Streetwear Brands For Day 17 of my 30-day challenge, I engineered AƉRA a bespoke digital showroom concept tailored for high-ticket streetwear labels, premium apparel brands, and luxury accessory storefronts. In the luxury e-commerce sector, a brand's digital flagship store dictates its perceived value. When an apparel label charges premium prices while relying on template-driven e-commerce setups, consumer trust drops and cart abandonment spikes. High-value buyers expect an interactive experience that mirrors an exclusive, physical gallery opening. This user interface maximizes conversion velocity by treating product drops as a cinematic event. The structure centers around a dynamic spatial grid that places the primary product canvas directly between an oversized, low-opacity background title layer and detailed technical typography blocks. By replacing generic add-to-cart buttons with micro-text specification metrics tracking coordinates, editions, and current viewing sequences, the layout intentionally heightens the product's premium appeal and scarcity. The result is a high-retention interface designed to maximize average order value (AOV) for digital luxury houses. Engineered natively via Google AI Studio and deployed live on Vercel. Are you a venture-backed apparel brand, fashion designer, or e-commerce enterprise looking to replace flat, generic templates with high-converting web architecture? Let's connect here or via DM to reconstruct your digital flagship storefront.
0
40
Cover image for Transforming Talent Acquisition Platforms Through
Transforming Talent Acquisition Platforms Through Elite Digital Architecture For Day 16 of my 30-day challenge, I engineered Quiety a premium, high-fidelity platform layout designed specifically for modern recruitment tech, HR software, and high-end freelance marketplaces. In the global talent economy, top-tier engineering and creative pioneers don't look for work on cluttered, uninspired legacy job boards. A company's digital storefront dictates the caliber of talent it attracts. To capture elite marketplace volume, the landing interface must feel smooth, authoritative, and frictionless. This system achieves maximum conversion clarity through an hyper-editorial layout structure. It centers around a dominant, highly stylized typographic header featuring a custom orange accent underscore that establishes a modern, tech-forward brand language. The core interaction hub features an ultra-clean, capsule-style dual search bar that eliminates multi-step friction for users. By framing the screen with floating micro-UI cards and abstract elements, the canvas mimics a fast, high-performance software experience before the user even clicks a button. Engineered natively in Google AI Studio and deployed via Vercel. Are you a venture-backed recruitment startup, HR-tech enterprise, or digital marketplace looking to capture top-market share and scale conversion velocity? Let's connect here or via DM to reconstruct your flagship workspace.
1
124
Web3 Developer | Solidity Blockchain Specialist | Automation
    5.0
    Rating
    6
    Followers
Web3 Developer | Solidity Blockchain Specialist | Automation
Web Designer |Kajabi Expert | UI/UX Designer| Brand Designer
New to Contra
Web Designer |Kajabi Expert | UI/UX Designer| Brand Designer
Cover image for Premium Coaching Website
Web Designer &
Premium Coaching Website Web Designer & UI/UX Designer Designed a modern coaching website with responsive layouts, clear content hierarchy, elegant typography, and conversion-focused landing pages.
1
120
Cover image for Another email automation connected
Another email automation connected
2
73
Cover image for Email Automation built on kajabi
Email Automation built on kajabi
1
45
Cover image for form code embedded
form code embedded
1
36