Project Overview
The client required an accurate steam load calculation and boiler selection for a manufacturing facility to ensure reliable steam generation while minimizing fuel consumption and future operating costs.
My Scope
Steam load calculation
Boiler capacity selection
Operating pressure evaluation
Fuel comparison
Efficiency assessment
Engineering recommendation
Engineering Approach Process steam demand was calculated based on production requirements, operating schedules, diversity factor, and future expansion. Multiple boiler capacities and fuel options were evaluated before selecting the optimum solution.
Outcome The recommended boiler capacity improved operating efficiency, reduced unnecessary oversizing, lowered expected fuel consumption, and provided sufficient reserve capacity for future production growth.