Faishal Ahmed - Consultant | Contra
Work by Faishal Ahmed
Sign Up
Post a job
Sign Up
Log In
Faishal Ahmed
Industrial Boiler & Steam System Consultant
Message
Follow
New to Contra
Faishal is ready for their next project!
Followed by
GALLERY L
Dhaka, Bangladesh
Work
Posts
Services
About
Dhaka, Bangladesh
0
Independent Industrial Boiler & Steam System Consulting for manufacturers and process industries. Hire me for paid engineering and consulting support in: • Steam System Optimization • Boiler Selection & Sizing • Boiler Performance & Efficiency Assessment • Steam Load Analysis • Condensate & Heat Recovery • Waste Heat Recovery Feasibility • Energy Optimization With 15+ years of industrial boiler, steam and thermal engineering experience, I help facilities identify energy losses, reduce operating costs, improve steam-system performance and make technically sound investment decisions. Available for international consulting projects, remote engineering assignments and paid technical collaboration. If you have a boiler, steam, thermal-energy or heat-recovery challenge, contact me to discuss the project. #IndustrialSteamConsultant #BoilerOptimization #SteamSystemOptimization #WasteHeatRecovery #ThermalEngineering
0
22
1
Helping Dairy & Food Processing Plants Reduce Steam Energy Costs Dairy and food processing plants depend on reliable steam systems for production. Many facilities lose energy and money due to: • Oversized boilers • Poor condensate recovery • Steam distribution losses • Incorrect operating pressure • Lack of steam system monitoring A properly optimized steam system can improve efficiency, reduce fuel consumption, and increase equipment reliability. I help manufacturing facilities with: ✓ Steam load analysis ✓ Boiler selection & sizing ✓ Steam system optimization ✓ Energy efficiency assessment ✓ Waste heat recovery feasibility studies Industrial energy efficiency starts with understanding the steam system. #SteamEngineering #EnergyEfficiency #DairyIndustry #Manufacturing #IndustrialEngineering
1
81
0
Project Overview The client required an accurate steam load calculation and boiler selection for a manufacturing facility to ensure reliable steam generation while minimizing fuel consumption and future operating costs. My Scope Steam load calculation Boiler capacity selection Operating pressure evaluation Fuel comparison Efficiency assessment Engineering recommendation Engineering Approach Process steam demand was calculated based on production requirements, operating schedules, diversity factor, and future expansion. Multiple boiler capacities and fuel options were evaluated before selecting the optimum solution. Outcome The recommended boiler capacity improved operating efficiency, reduced unnecessary oversizing, lowered expected fuel consumption, and provided sufficient reserve capacity for future production growth.
0
81
0
Industrial Steam System Design & Optimization
0
118