Being an expert in simulation tools, client requested for the simulation work to be carried out within 12 months - from basic steady state simulation to dynamic simulation for control design. The feed stream is expected to be stabilized within +/-15% disturbance to pressure, temperature, and CO2 composition to ensure the technology is able to operate within its envelope.