Description: Designed and supervised the construction of sanitary and stormwater sewer systems for the “Miravalle” and “Ciudadela del Chofer” residential developments in Catamayo. Utilized AutoCAD Civil 3D to create detailed plans approved by municipal agencies, ensuring efficient and sustainable installations.
Results: These projects improved basic infrastructure for the developments, benefiting over 500 residents and meeting local construction standards.