The first module created is responsible for logging and categorizing downtimes during the brewing process.
Various visual explorations and usability test sessions were conducted with users to ensure the interface was intuitive and effective.
After validating the iterations, the interface was handed off to the development team, ensuring all specifications and feedback from the tests were incorporated.
With the arrival of new contexts, it was necessary to design a new navigation. The navigation provided by the existing design system would not suffice to meet the required levels to accommodate the new contexts.
From this point, the design team grew, and the contexts were divided between me and another designer.
Final navigation
The MVP was successfully launched, meeting the needs of SAZ breweries.
The downtimes categorization rate in the brewing process improved from 1.52 to 10.20% between July-August 2023.