A class assignment where we were asked to carry out a substantial sized scale project. Go Green or Go home is a detailed Project Management plan aimed to open a Hybrid Cars Dealership.
Project Description
Go Green or Go Home is an entirely new Hybrid Cars dealership with new premises, offices and management visions. Contributing to building environmentally conscious thinking when it comes to automobiles. The facility will operate with the help of renewable green energy to contribute to a lower carbon footprint.
Please Note: Full budget breakdown, WBS dictionary, Activity attributes, Network Diagram, Gnatt Chart, Requirements and Requirements Traceability Matrix were undisclosed for privacy reasons
Project Overview
Issue
Consumers are facing the difficulty of finding a one-stop shop where they can find and become educated on the perfect Hybrid vehicle for themselves
Purpose
The purpose of Go Green or Go Home is to construct a one-stop shop where customers can find their desired Hybrid car.
Business Objectives
To construct a hybrid cars dealership that will help educate people on hybrid cars, and will offer a one-stop shop for lovers of hybrid cars and environmental enthusiasts.
Goals
To construct a fully operating hybrid cars dealership that helps with educating people on hybrid cars and offering the sale of various brands of hybrid vehicles.
Expected Deliverables
Ontario Motor Vehicle Industry Council (OMVIC) License
Drawings for contractors
Apply for city permits and business permits
Construction of the building (including inspections)
Solar Panels for electricity
Sign contracts with Car manufacturers (Toyota, Ford, Tesla, Nissan, Honda)
Presenting our business to potential investors, stakeholders and sponsors
Expanding business with other hybrid car producers such as BMW and other emerging vehicle brands as demand pulls.
Starting the sales
Project Scope
In Scope
New Hybrid Cars
Out of Scope
Second-hand/used cars of any kind
Standard vehicles that run on fuel
Vehicles that are fully electrical
Budget
High Level Budget
$90,000.000 - $100,000.000 CAD
Additional Allowed
10%
Budget Breakdown
Excavation, Foundation and structure: $200,000.00 CAD
Roofing: $50,000.00 CAD
HVAC: $100,000.00 CAD
Insulation: $100,000.00 CAD
Materials: $15,000.00 CAD
Electrical: $90,000.00 CAD
Alarm System: $10,000.00 CAD
Plumbing: $50,965. 00 CAD
Drywall: $100,000.00 CAD
Flooring: $90,000.00 CAD
Painting: $50,000.00 CAD
Furnishing: $100,000.00 CAD
Total Estimated Cost: $955,965.00 CAD + 10%
Risks
Delays in start time due to weather conditions
Delays in opening due to hybrid cars not being delivered within the agreed-scheduled date
Constraints
Unpredicted expenses
Assumptions
All items/tasks are to be delivered within the scheduled time frame
Suppliers will deliver everything on time
The government will approve everything for us within the estimated time frame
Transparency
No uncontrollable/environmental disasters events
All equipment and construction will be in good (up to standards) condition
All stakeholders will be at the meeting - so that communication is clear
We will be able to establish relationships with the investors, stakeholders and sponsors we have in mind
Work Breakdown Structure (in text format)
1.Go Green or Go Home
1.1 Project Management
1.1.1 Team Charter
1.1.1.1 Identify stakeholders
1.1.1.2 Identify member responsibilities
1.1.1.3 Identify communications arrangements
1.1.1.4 Finalize all agreements
1.1.1.5 Get member signatures
1.1.2 Project Charter
1.1.2.1 Project Overview
1.1.2.2 Project Budget
1.1.2.3 Project Goals
1.1.2.4 Project Milestones
1.1.2.5 Risks, constraints, assumptions
1.1.3 Scope Statement(s)
1.1.3.1 Project Scope
1.1.3.1.1 Boundaries
1.1.3.1.2 Objectives
1.1.3.1.3 Deliverables
1.1.3.2 Product Scope
1.1.3.2.1 Features
1.1.3.2.2 Functions
1.1.3.2.3 Characteristics
1.1.4 Scheduling
1.1.5 Risk Planning
1.2 License
1.2.1 Ontario Motor Vehicle Industry Council (OMVIC)
1.3 Drawings
1.3.1 Survey
1.3.2 Architectural Plans
1.3.3 Blueprints
1.3.4 HVAC Drawings
1.3.5 Infrastructure - 2D/3D models (Software)
1.4 Permits/City Permits
1.4.1 Obtaining Building Permit(s)
1.4.1.1 Roof Sign
1.4.1.1 Inspection Sign
1.4.2 Obtaining Non-residential HVAC Permit(s)
1.4.3 Obtaining Non-residential Plumbing and drainage Permit(s)
1.4.4 Obtaining Business Permit(s)
1.5 Construction
1.5.1 Excavating and Building the Foundation and structure
1.5.1.1 Close the area
1.5.1.2 Setting out corner benchmarks.
1.5.1.3 Surveying the ground and top levels.
1.5.1.4 Excavation to the approved depth.
1.5.1.5 Dressing the loose soil.
1.5.1.6 Making up to the cut-off level.
1.5.1.7 The construction of dewatering wells and interconnecting trenches.
1.5.1.8 Making boundaries of the building
1.5.1.9 Site Clearance Before Excavation for Foundation.
1.5.1.10 Setting out Foundation Layout for Excavation.
1.5.1.11 Excavation Procedure for Foundation. Open Planking for Excavations in Soft and Loose Soils
1.5.1.11 Concreting of Foundation in Excavation.
1.5.2 Roofing
1.5.2.1 Roll out the underlayment
1.5.2.2 Cover the roof with felt paper
1.5.2.3 Waterproof the valleys
1.5.2.4 Apply starter shingles
1.5.2.5 Install the shingles
1.5.2.6 Install the flashing
1.5.3 HVAC
1.5.3.1 Air return
1.5.3.2 Filter
1.5.3.3 Exhaust outlets
1.5.3.4 Ducts
1.5.3.5 Electrical elements
1.5.3.6 Outdoor unit
1.5.3.7 Compressor
1.5.3.8 Coils and blower
1.5.4 Plumbing and Drain Installation
1.5.4.1 Install hot Water Pipes
1.5.4.2 Install cold Water Pipes
1.5.4.3 Install Drainage pipes
1.5.4.4 Install Pipe connections
1.5.4.5 Install Fixtures
1.5.5 Insulation
1.5.5.1 Insert the Insulation
1.5.5.2 Cut the Insulation
1.5.5.3 Staple in Place
1.5.5.4 Fill the Gaps
1.5.5.5 Install the Sheeting
1.5.5.6 Insulate the Header Joists
1.5.5.7 Insulate the Crawl Space Floor Joists
1.5.5.8 Secure in Place
1.5.6 Electrical installations
1.5.6.1 Preparation of work
1.5.6.2 Conduct and fittings
1.5.6.3 Cabling
1.5.6.4 Testing wiring system
1.5.6.5 Installation of meter
1.5.7 Alarm System Installation
1.5.7.1 Perimeter protection
1.5.7.2 Area protection
1.5.7.3 Spot protection
1.5.7.4 Control panel
1.5.7.5 Door and window sensors
1.5.7.6 Glass break sensors
1.5.7.7 Security cameras
1.5.8 Drywall
1.5.8.1 Fasten brackets
1.5.8.2 Measurement
1.5.8.3 Prepare the drywall (measure, snap and smooth)
1.5.8.4 Cut openings
1.5.8.5 Finish fastening
1.5.9 Painting
1.5.9.1 Selecting paint colours
1.5.9.2 Selecting paint finish
1.5.9.3 Prepping the space for paintwork (painters tape)