A class assignment where we were asked to carry out a substantial sized scale project. Go Green or Go home is a detailed Project Management plan aimed to open a Hybrid Cars Dealership.
Project Description
Go Green or Go Home is an entirely new Hybrid Cars dealership with new premises, offices and management visions. Contributing to building environmentally conscious thinking when it comes to automobiles. The facility will operate with the help of renewable green energy to contribute to a lower carbon footprint.
Project Overview
Issue
Consumers are facing the difficulty of finding a one-stop shop where they can find and become educated on the perfect Hybrid vehicle for themselves
Purpose
The purpose of Go Green or Go Home is to construct a one-stop shop where customers can find their desired Hybrid car.
Business Objectives
To construct a hybrid cars dealership that will help educate people on hybrid cars, and will offer a one-stop shop for lovers of hybrid cars and environmental enthusiasts.
Goals
To construct a fully operating hybrid cars dealership that helps with educating people on hybrid cars and offering the sale of various brands of hybrid vehicles.
Expected Deliverables
Project Scope
In Scope
Out of Scope
Budget
High Level Budget
$90,000.000 - $100,000.000 CAD
Additional Allowed
10%
Budget Breakdown
Risks
Constraints
Assumptions
Work Breakdown Structure (in text format)
1.Go Green or Go Home
1.1 Project Management
1.1.1 Team Charter
1.1.1.1 Identify stakeholders
1.1.1.2 Identify member responsibilities
1.1.1.3 Identify communications arrangements
1.1.1.4 Finalize all agreements
1.1.1.5 Get member signatures
1.1.2 Project Charter
1.1.2.1 Project Overview
1.1.2.2 Project Budget
1.1.2.3 Project Goals
1.1.2.4 Project Milestones
1.1.2.5 Risks, constraints, assumptions
1.1.3 Scope Statement(s)
1.1.3.1 Project Scope
1.1.3.1.1 Boundaries
1.1.3.1.2 Objectives
1.1.3.1.3 Deliverables
1.1.3.2 Product Scope
1.1.3.2.1 Features
1.1.3.2.2 Functions
1.1.3.2.3 Characteristics
1.1.4 Scheduling
1.1.5 Risk Planning
1.2 License
1.2.1 Ontario Motor Vehicle Industry Council (OMVIC)
1.3 Drawings
1.3.1 Survey
1.3.2 Architectural Plans
1.3.3 Blueprints
1.3.4 HVAC Drawings
1.3.5 Infrastructure - 2D/3D models (Software)
1.4 Permits/City Permits
1.4.1 Obtaining Building Permit(s)
1.4.1.1 Roof Sign
1.4.1.1 Inspection Sign
1.4.2 Obtaining Non-residential HVAC Permit(s)
1.4.3 Obtaining Non-residential Plumbing and drainage Permit(s)
1.4.4 Obtaining Business Permit(s)
1.5 Construction
1.5.1 Excavating and Building the Foundation and structure
1.5.1.1 Close the area
1.5.1.2 Setting out corner benchmarks.
1.5.1.3 Surveying the ground and top levels.
1.5.1.4 Excavation to the approved depth.
1.5.1.5 Dressing the loose soil.
1.5.1.6 Making up to the cut-off level.
1.5.1.7 The construction of dewatering wells and interconnecting trenches.
1.5.1.8 Making boundaries of the building
1.5.1.9 Site Clearance Before Excavation for Foundation.
1.5.1.10 Setting out Foundation Layout for Excavation.
1.5.1.11 Excavation Procedure for Foundation. Open Planking for Excavations in Soft and Loose Soils
1.5.1.11 Concreting of Foundation in Excavation.
1.5.2 Roofing
1.5.2.1 Roll out the underlayment
1.5.2.2 Cover the roof with felt paper
1.5.2.3 Waterproof the valleys
1.5.2.4 Apply starter shingles
1.5.2.5 Install the shingles
1.5.2.6 Install the flashing
1.5.3 HVAC
1.5.3.1 Air return
1.5.3.2 Filter
1.5.3.3 Exhaust outlets
1.5.3.4 Ducts
1.5.3.5 Electrical elements
1.5.3.6 Outdoor unit
1.5.3.7 Compressor
1.5.3.8 Coils and blower
1.5.4 Plumbing and Drain Installation
1.5.4.1 Install hot Water Pipes
1.5.4.2 Install cold Water Pipes
1.5.4.3 Install Drainage pipes
1.5.4.4 Install Pipe connections
1.5.4.5 Install Fixtures
1.5.5 Insulation
1.5.5.1 Insert the Insulation
1.5.5.2 Cut the Insulation
1.5.5.3 Staple in Place
1.5.5.4 Fill the Gaps
1.5.5.5 Install the Sheeting
1.5.5.6 Insulate the Header Joists
1.5.5.7 Insulate the Crawl Space Floor Joists
1.5.5.8 Secure in Place
1.5.6 Electrical installations
1.5.6.1 Preparation of work
1.5.6.2 Conduct and fittings
1.5.6.3 Cabling
1.5.6.4 Testing wiring system
1.5.6.5 Installation of meter
1.5.7 Alarm System Installation
1.5.7.1 Perimeter protection
1.5.7.2 Area protection
1.5.7.3 Spot protection
1.5.7.4 Control panel
1.5.7.5 Door and window sensors
1.5.7.6 Glass break sensors
1.5.7.7 Security cameras
1.5.8 Drywall
1.5.8.1 Fasten brackets
1.5.8.2 Measurement
1.5.8.3 Prepare the drywall (measure, snap and smooth)
1.5.8.4 Cut openings
1.5.8.5 Finish fastening
1.5.9 Painting
1.5.9.1 Selecting paint colours
1.5.9.2 Selecting paint finish
1.5.9.3 Prepping the space for paintwork (painters tape)
1.5.9.4 Painting
1.5.9.5 Cleaning after painting
1.5.10 Flooring
1.5.10.1 Selecting floor tiles
1.5.10.2 Selecting floorboards
1.5.10.3 Putting in the tiles and floorboards
1.5.11 Furnishing
1.5.11.1 Select colour theme
1.5.11.2 Select Items
1.5.11.3 Select design theme
1.5.11.4 Select the designated location for items
1.5.11.5 Purchase (office) Items
1.5.11.6 Place item
1.6 Business Sponsors
1.6.1 Prepare contracts
1.6.2 Prepare presentations
1.6.3. Schedule meetings