This was my first project at this scale, and the requirements gathering process reflected that. I worked directly with Seabob Partner's team to map their existing workflows before writing a single line of code, identifying bottlenecks, redundant steps, and the specific pain points their staff dealt with daily. The portal was built iteratively, with feedback loops at each stage to make sure the system matched how the team actually works, not just how it looked on paper.