Case Study: Turning a Stalled Experience Into a 55%
Faster Process — In 90 Days
The Situation
A mid-sized LatAm memorial & cemetery services group (500+ employees) had
no function responsible for planning, measuring, and improving processes
end-to-end. Problems were identified, "solved," and measured by the
same team that owned them — with no line back to the company's four strategic
KPIs (operating profitability, NPS, eNPS, brand positioning). A performance
committee had been created on paper but needed activation.
My Role
I joined as the external member of the newly formed committee, not as an
outside auditor, but as the operator who runs the cadence: monthly sessions,
bi-weekly follow-up, and the discipline to turn diagnostics into decisions
Executive Direction can actually act on.
The Approach
Rather than mapping every process in the organization first , a path that risks
a year with no visible result , we picked one high-impact, cross-functional
process, solved it completely, and used it to install the method. The process
chosen: plaque fulfillment, selected because of its direct link to complaints
and NPS, its cross-departmental nature, and a scope small enough to resolve in one work cycle.
What the Diagnostic Found
35% of all company complaints traced back to this single process
First-Time Quality of 47.8% , meaning more than half of all cases required rework
76-day customer wait time on the fastest path, against a 30-day promise
17% cost overrun from rework and process loops
A quality control step that verified the vendor's paperwork, not the customer's actual request, a control that couldn't catch its own root cause
What's Next
The redesign cuts lead time in half without touching the vendor side, the remaining lever requires a leadership decision on sourcing. The committee is now taking three decisions to Executive Direction (sales channel redesign, vendor diversification, and a low-cost operational fix worth ~8x its investment in avoided losses), while queuing the next end-to-end process for the following cycle, proving the method scales, not just solves one problem.


0 likes · 1 view · Aug 26, 2026
Case Study: Turning a Stalled Experience Into a 55% Faster Process — In 90 Days The Situation A mid-sized LatAm memorial & cemetery services group (500+ emp...