Muhammad Shehryar's Work | Contra
Work by Muhammad Shehryar
Sign Up
Post a job
Sign Up
Log In
Muhammad Shehryar
Civil Engineer
Message
Follow
Ready for work
Muhammad is ready for their next project!
Faisalabad, Pakistan
Work
Services
About
Faisalabad, Pakistan
0
Structural design and seismic analysis using etabs
0
58
0
Scheduling on a Primavera P6
0
67
0
Quantity takeoff and cost estimation using bluebeam revu
0
71
0
2D Auto CAD Drafting and redraw drawings.
0
97