
Case Study: Operations Upgrade
0 likes · 4 views · Jul 20, 2025
Researched and introduced a new PM system with templates and planned a phased rollout for an architecture firm, cutting costs 10 % and saving staff 5–6 hrs/wk.

0 likes · 4 views · Jul 20, 2025
Researched and introduced a new PM system with templates and planned a phased rollout for an architecture firm, cutting costs 10 % and saving staff 5–6 hrs/wk.