How We Built a Film Production Website in Eight WeeksHow We Built a Film Production Website in Eight Weeks
The network for creativity
Join 1.25M professional creatives like you
Connect with clients, get discovered, and run your business 100% commission-free
Creatives on Contra have earned over $150M and we are just getting started
How do you build a website for a film production company in Vancouver, from Brazil, in eight weeks? Everything happened in one Figma file, designed on auto layout from the very first frame. Three to four rounds later, the design was ready to build, and since the structure was already there, the Framer build took 17 days. We wrote the whole process down, plus the four decisions that shaped the site 👉 https://apta.agency/blog/blog-index/how-we-built-a-production-company-website-in-8-weeks
Post image
Rasaq's avatar
Great process. Designing with auto layout from the start clearly helped keep the handoff to Framer much more efficient.
Back to feed
The network for creativity
Join 1.25M professional creatives like you
Connect with clients, get discovered, and run your business 100% commission-free
Creatives on Contra have earned over $150M and we are just getting started