Polish Sprint: a UI audit, and the fixes shipped in your code by Pedro GuarizePolish Sprint: a UI audit, and the fixes shipped in your code by Pedro Guarize
Polish Sprint: a UI audit, and the fixes shipped in your codePedro Guarize
Your product works, but it doesn’t feel finished. In one to two weeks I audit it against a measured bar and ship the fixes in your code, so what you get is merged changes, not a report.
Best fit if
Your product is live and its flows are right, but the details aren’t: type, spacing, contrast, motion, responsiveness.
You want changes you can measure, not a redesign.
Not a fit if
You need new features or whole flows redesigned. That’s a Product UI Build.
What you get
An audit against a measured bar: contrast, type, targets, motion, layout.
Fixes to spacing, type, motion, responsiveness and accessibility.
The audit’s checks left in your CI, so the fixes stay fixed.
At handover
The audit, written: every issue measured before and after, and where it lives in your code.
Every fix as a pull request in your repo, ready to review.
The audit’s checks running in your CI, so new work meets the same bar.
A short video walking through what changed.
How it runs
A 30-minute call: the goal, the deadline, who decides, the budget range.
A proposal within 48 hours, with three options: small, recommended, full.
Half to start, on a signed scope. Half on delivery.
A weekly update with a short video and a staging link.
Three rounds of revisions.
See it done
My site’s hero opens the way products often ship, then fixes itself: its type, its edges, its contrast, its button and its keycaps, each one measured. It’s in my Work: “Polish, live”.
Your product works, but it doesn’t feel finished. In one to two weeks I audit it against a measured bar and ship the fixes in your code, so what you get is merged changes, not a report.
Best fit if
Your product is live and its flows are right, but the details aren’t: type, spacing, contrast, motion, responsiveness.
You want changes you can measure, not a redesign.
Not a fit if
You need new features or whole flows redesigned. That’s a Product UI Build.
What you get
An audit against a measured bar: contrast, type, targets, motion, layout.
Fixes to spacing, type, motion, responsiveness and accessibility.
The audit’s checks left in your CI, so the fixes stay fixed.
At handover
The audit, written: every issue measured before and after, and where it lives in your code.
Every fix as a pull request in your repo, ready to review.
The audit’s checks running in your CI, so new work meets the same bar.
A short video walking through what changed.
How it runs
A 30-minute call: the goal, the deadline, who decides, the budget range.
A proposal within 48 hours, with three options: small, recommended, full.
Half to start, on a signed scope. Half on delivery.
A weekly update with a short video and a staging link.
Three rounds of revisions.
See it done
My site’s hero opens the way products often ship, then fixes itself: its type, its edges, its contrast, its button and its keycaps, each one measured. It’s in my Work: “Polish, live”.