Most businesses don’t need another chatbot.
They need AI agents that can think, act, automate workflows, and actually get work done.
We build Agentic AI systems that handle operations, customer interactions, decision-making, and repetitive tasks autonomously helping companies scale faster with less manual work.
1
3
227
Website and software for Hair transplant company
3
5
327
Excited to announce the successful launch of Cosmo Drive by Repla Technologies Pvt Ltd! (https://www.replatechnologies.com)
This rare iOS app lets you seamlessly transfer data from your iPhone to SD cards and other external devices something very few apps in the market (https://www.linkedin.com/in/hammadworks) can do.
A game-changer for iPhone users who need fast, reliable, and flexible data management!
View here: https://www.figma.com/design/DhvuNSGmfv9AYLGQPwDzBf/File-Transfer-Application-(SSD)?m=auto&t=6LZOmtYfdu0eIY1y-6
AI & Full-Stack Engineer | Product Design & Development
$10k+
Earned
5x
Hired
5.0
Rating
38
Followers
AI & Full-Stack Engineer | Product Design & Development
What if reporting a bug took seconds instead of minutes?
That’s the idea behind Lucidmark.
A product case study: Building a smarter bug reporting workflow for software teams.
During software development, one challenge appears again and again:
-> QA teams discover bugs.
-> Developers need complete context.
-> Managers need visibility.
But when information is scattered across different tools and conversations, teams lose valuable time.
That was the problem we set out to solve with Lucidmark, a modern bug reporting and project tracking platform designed to make QA workflows faster and more organized.
The challenge:
Create a simple way for teams to capture bugs instantly while keeping everyone aligned throughout the development process.
The solution:
Lucidmark brings bug reporting, task management, collaboration, and integrations into one centralized platform.
Teams can:
• Capture bugs directly from websites using an embedded reporting widget
• Manage issues through visual Kanban workflows
• Assign tasks and collaborate with team members
• Connect existing workflows with Jira, Trello, ClickUp, and Slack
• Analyze QA performance through reporting dashboards
Technology behind the product:
Frontend → Next.js + Shadcn UI
Backend → Nest.js
Infrastructure → AWS + Vercel
Payments → Stripe
The biggest challenge wasn’t building another bug tracker.
It was designing a workflow where QA teams, developers, and managers could collaborate without unnecessary friction.
The result?
A platform that transforms scattered bug reports into clear, actionable workflows.
This project reinforced something I strongly believe:
Great software is not just about writing code.
It’s about understanding problems, designing better experiences, and creating solutions that make work easier.
Another product shipped. Another problem solved.
#SoftwareDevelopment #SaaS #FullStackDevelopment #NextJS #NestJS #WebDevelopment #ProductDevelopment #QA #SoftwareEngineering
Full Stack Developer expertise in building robust apps.
Full Stack Developer expertise in building robust apps.
The HRM system was developed to streamline employee management processes, reduce manual work, and improve overall efficiency. It features a user-friendly interface for easy employee registration and role assignment, along with role-based access control to ensure appropriate permissions for administrators and managers.
The system integrates ZKTeco attendance machines for automated and accurate attendance tracking. It also includes modules for leave and loan management, allowing employees to apply seamlessly with proper approval workflows.
Payroll processing is fully automated, considering factors such as attendance, loans, provident funds, significantly reducing errors and processing time. Overall, the system is designed to be fully automated, ensuring smooth HR operations while enhancing productivity and employee satisfaction.
0
116
Reporting system designed specifically to streamline your operations, improve accuracy, and give you
complete control over your data in real time.
In today’s fast-paced environment, relying on manual
processes or scattered data can lead to delays, errors, and missed
opportunities.
Monitor all your operations from a single dashboard
Generate accurate, real-time reports instantly
Reduce manual workload and human errors
Track performance, trends, and key metrics effortlessly
Make faster, data-driven decisions with confidence
Additionally, the system can be customized according to your
specific business needs—ensuring that it aligns perfectly with your workflow
rather than forcing you to adapt to generic software.
One of the biggest advantages is automation. Tasks that
currently take hours can be completed in seconds
0
100
Design & Develop a Profession, clean, responsive and Product rich website for interior designer Outlet.
0
73
Design & Develop professional, responsive and SEO Optimized website for Cranes and Heavy Machinery Company.
Introducing OneCart — a modern, full-stack fashion e-commerce platform built for a seamless shopping experience across Men, Women, and Kids categories.
🛍️ Home Page — A bold hero banner with rotating slides, "Fashion Made for Everyone" messaging, and a clean navigation bar (Home, Collections, About, Contact) with live cart count.
🧥 All Collections Page — Smart sidebar filters by Category (Men/Women/Kids) and Subcategory (Topwear, Bottomwear, Winterwear), plus a "Sort By: Relevant" dropdown for easy browsing across a full product grid with pricing.
💬 About Us Section — A clean, editorial-style layout introducing the brand story and mission alongside lifestyle imagery.
🔐 Authentication Flow — A sleek Create Account screen with Google OAuth sign-in and standard email/password registration, matching the site's dark, minimal aesthetic throughout.
Built with a focus on responsive design, intuitive navigation, and a consistent dark-mode UI with gold accent branding — OneCart delivers a premium, distraction-free shopping experience from landing page to checkout.
💻 Tech stack / features you can customize: [add your stack here — e.g., React, Node.js, MongoDB, Stripe]
0
19
🚀 First Client Website Project Completed
Project Name: Risel Growth Agency Website
I designed and developed a complete business website for a social media growth and digital marketing agency.
Project Goals:
• Establish a professional online presence
• Showcase services effectively
• Build trust through testimonials and branding
• Generate leads through a contact system
• Deliver a seamless experience across all devices
Key Features:
✅ Fully Responsive Design
✅ Modern UI/UX
✅ React.js Development
✅ Smooth Animations & Interactions
✅ Statistics Counter Section
✅ Brand Showcase Carousel
✅ Client Testimonials
✅ Contact Form
✅ Performance-Focused Architecture
Tech Stack:
• React.js
• Vite
• JavaScript
• CSS3
• Responsive Web Design
Results:
The final website provides a clean, professional, and conversion-focused experience that helps the agency present its services and credibility effectively.
Services I Offer:
• Frontend Development
• React Development
• Landing Pages
• Business Websites
• Portfolio Websites
• UI/UX Implementation
• Responsive Web Design
Available for freelance opportunities and new projects.
0
39
Built a full-stack AI chat application from scratch. Features a Claude-style sidebar, chat history, two AI models (LLaMA 3 8B and 70B via Groq), animated neon dark UI, and a secure Node.js backend deployed on Render.com (http://Render.com). The backend protects the API key with secret header auth, rate limiting, and input validation. Tech: React Native, TypeScript, Node.js, Express, Groq API, AsyncStorage GitHub: https://github.com/amjadshahg-png/LunaAI Image: Use screenshot of LunaAI home screen
1
136
Zaphtra Ltd — Website Features
Modern Hero Section — Bold, animated intro with clear value proposition and CTA-driven design
Responsive Navigation Bar — Clean, sticky navbar with smooth section links (About, Services, Tech Stack, Projects, Contact)
Services Showcase — Card-based layout highlighting core offerings: Web Apps, AI Solutions, Automation, and API Integrations
Interactive Tech Stack Display — Dynamic badge/pill components listing all technologies used
Glassmorphism UI Design — Frosted, semi-transparent panels over a gradient sky background for a premium, modern look
Consistent Design System — Recurring visual motifs (divider lines, icon badges, card layouts) tying every section together
Built with React — Component-based frontend for fast rendering and easy scalability
Node.js + Express Backend — Structured backend architecture ready for dynamic content and form handling
MongoDB Integration — Database layer set up for future dynamic features (projects, inquiries, CMS-style content)
AI-Ready Architecture — Built to integrate OpenAI and Claude APIs directly into the platform
Fully Responsive Layout — Optimized for desktop and mobile viewing
Fast Load & Clean Performance — Lightweight, optimized assets for quick page loads