BenchMark
◆ Context & Challenge
The client needed a modern and scalable digital platform to showcase services, support marketing campaigns, and improve client engagement. The challenge was to combine high-performance web development with UX-driven design and integrated marketing tools, while enabling businesses to track performance and optimize their digital presence effectively
◆ Approach & Solution
We developed a user-centric digital platform that integrates design, content, and marketing capabilities, enabling businesses to manage their online presence and drive data-driven growth.
◆ Key focus areas:
‣ User-centric UI/UX for improved engagement
‣ SEO and performance marketing integration
‣ Content-driven architecture for scalability
‣ Analytics and conversion tracking systems
‣ Secure and high-performance infrastructure
◆ Execution
‣ Built responsive and scalable web platform
‣ Implemented SEO and content management capabilities
‣ Integrated analytics tools for user behavior tracking
‣ Developed UX testing and usability optimization workflows
‣ Designed secure hosting and performance-focused architecture
◆ Outcome & Impact
The platform enables businesses to enhance their digital presence and optimize marketing performance.
‣ Improved user engagement through optimized UX design
‣ Increased visibility with integrated SEO strategies
‣ Data-driven decision making with analytics insights
‣ Enhanced conversion rates through performance optimization
‣ Scalable foundation for ongoing digital growth
0
81
Global Trade Intalligence Tool
0
69
OpenTruth: Independent Verification Protocol
Claims made by AI systems and organisations are hard to check, and the evidence behind them can be quietly changed after the fact.
I built OpenTruth, an independent verification protocol that links each claim to its supporting evidence in a hash-protected evidence graph. Because every piece of evidence is hashed, any later tampering becomes detectable, and anyone can trace a claim back to exactly what supports it.
What this shows: I can design trust and verification systems end to end, from the data model to the integrity guarantees.
0
35
Built and deployed my AI Engineering portfolio featuring a production-ready RAG assistant that lets visitors interact with an AI trained on my professional experience, projects, skills, and technical background.
The assistant uses FastAPI, LangGraph, Qdrant, Groq, and Python to retrieve relevant context and generate accurate, conversational responses. The portfolio itself is built with Next.js and Tailwind CSS, with the AI backend deployed separately and integrated through a live API.
This project demonstrates my ability to build and deploy complete GenAI applications—from vector search and RAG pipelines to backend APIs and production frontend integration.
Project 3 — Data Quality Checker
Title: Data Quality Checker — AWS S3 · Terraform · GitHub Actions
Description: A CLI tool automating data quality checks (nulls, duplicates, referential integrity, freshness, and schema drift) on a Kimball star-schema warehouse. AWS S3 provisioned as IaC with Terraform. Full CI/CD via GitHub Actions on every push.
Link: https://github.com/Krupa03/data-quality-checker