Projects using Stata in İstanbul
Projects using Stata in İstanbul
Sign Up
Post a job
Sign Up
Log In
Filters
2
Projects
People
0
AKLILU ABRHAM ROBA
Turning messy time-series plots into publication-ready figures. Before: cluttered line and distracting spikes that hide the story. After: cleaned, consistent formatting, and a smoother trend line that makes the pattern readable. If you have a dataset that needs a journal-ready figure (and export at high resolution), message me.
0
4
0
AKLILU ABRHAM ROBA
Precision Matters. Bad data leads to bad conclusions. I specialize in high-level statistical analysis and rigorous research methodology (APA 7 expert). From cleaning messy datasets to producing Q1-journal-ready tables, I handle the heavy lifting so you can focus on the breakthrough. Ready to elevate your research in 2026? Let's connect. Tags: #AcademicResearch #Statistics #SPSS #Stata #DataScience
0
10
1
AKLILU ABRHAM ROBA
Data doesn't take a holiday, and neither does accuracy. ❄️📈 Celebrating the #HolidayChallenge by showcasing what I do best: Professional Data Analysis & Statistical Consulting. From Healthcare to Finance, I help you make sense of the numbers. Let’s collaborate!
1
55
1
AKLILU ABRHAM ROBA
Project: Statistical Design & Power Analysis for IPV Intervention Study I delivered a same-day Data Analysis Plan and Power Analysis for a complex longitudinal study (3 groups, 18-month duration). Method: Mixed-Design ANOVA (Within-Between) using G*Power. Outcome: Verified that a sample size of N=200 yields 91.24% Power, ensuring the study is robust enough to detect small effects (f=0.10).
1
12
1
AKLILU ABRHAM ROBA
Project Title: European Corporate Growth Analysis (STATA) 📈 The Work: A deep-dive analysis of 1,734 data points across Europe (2004–2022). I used Robust Linear Regression to test the impact of Inflation, GDP, and ECB Interest Rates on company growth. Key Deliverables: 6-Stage Regression Analysis: Moving from baseline controls to complex interaction terms. Data Cleaning & Testing: Managed issues of heteroskedasticity and multicollinearity to ensure "trustworthy" estimates. Visual Trend Analytics: Created high-clarity time-series graphs tracking Inflation, Debt, and GDP Growth through three major global economic cycles. Tools Used: STATA 16, Excel, Econometric Modeling.
1
6
0
AKLILU ABRHAM ROBA
Multilevel Modeling & Complex Survey Data
0
0
Explore projects