Your cloud bill keeps growing, but nobody can say which pipeline, job or AI call is driving it. I map every dollar of spend to the workflow and owner behind it, then fix the costly parts in code and infrastructure, not just in a report.
What you get
Spend audit on AWS, GCP or Azure, mapped to workloads and owners
Right-sizing of compute, storage lifecycle rules and a savings-plan strategy
Query tuning for BigQuery, Athena and Snowflake
LLM cost control: model routing, caching and smaller models where quality holds
Budgets, alerts and rollback paths so the savings last
Proof
Van Data Team cost engagements target a 20 to 60% cut in cloud spend, with reliability guardrails kept in place
Cut LLM cost by about 92% on a Slack sales-KPI reporting agent by moving the summary step to Claude Haiku
Production systems running on AWS ECS Fargate, GCP BigQuery and Azure
Timeline: a typical engagement runs 8 to 14 weeks. We can start with a fixed-scope spend audit.
Popular projects
AWS cost optimization and FinOps reviews
Google Cloud and BigQuery cost reduction
Azure cost optimization and architecture review
Cloud architecture and infrastructure as code with Terraform
LLM and AI inference cost reduction
Pricing: the starting price covers a 2-week fixed-scope spend audit with a prioritized savings plan. Implementation expands to your requirements.
Your cloud bill keeps growing, but nobody can say which pipeline, job or AI call is driving it. I map every dollar of spend to the workflow and owner behind it, then fix the costly parts in code and infrastructure, not just in a report.
What you get
Spend audit on AWS, GCP or Azure, mapped to workloads and owners
Right-sizing of compute, storage lifecycle rules and a savings-plan strategy
Query tuning for BigQuery, Athena and Snowflake
LLM cost control: model routing, caching and smaller models where quality holds
Budgets, alerts and rollback paths so the savings last
Proof
Van Data Team cost engagements target a 20 to 60% cut in cloud spend, with reliability guardrails kept in place
Cut LLM cost by about 92% on a Slack sales-KPI reporting agent by moving the summary step to Claude Haiku
Production systems running on AWS ECS Fargate, GCP BigQuery and Azure
Timeline: a typical engagement runs 8 to 14 weeks. We can start with a fixed-scope spend audit.
Popular projects
AWS cost optimization and FinOps reviews
Google Cloud and BigQuery cost reduction
Azure cost optimization and architecture review
Cloud architecture and infrastructure as code with Terraform
LLM and AI inference cost reduction
Pricing: the starting price covers a 2-week fixed-scope spend audit with a prioritized savings plan. Implementation expands to your requirements.