Operations Teardown for Trade Contractors by Nouman SadiqOperations Teardown for Trade Contractors by Nouman Sadiq
Operations Teardown for Trade ContractorsNouman Sadiq
Ninety minutes on how your operation actually runs, then a written map of it. No build starts without one.
WHAT WE COVER
How a job comes in. How an estimate gets made and who chases it. How the crew learns today's work. How subcontractors and materials get tracked against a job. How an invoice goes out and gets paid. And the one thing that would make next Monday easier.
WHAT YOU GET, WITHIN 48 HOURS
Your operation drawn on a single page. Three leaks named specifically, each with a clearly reasoned range for what it plausibly costs you. The system design: what gets built, in what order, and what each phase does. A fixed price to close it.
Yours to keep either way. If you go ahead with the build, the $500 comes off the price.
WHY IT EXISTS
Unclear requirements, not slow development, is the one thing that has ever made a build of mine run long. So I do not start one without this. The document is the product, and it is also, word for word, the build spec.
BEFORE WE START
Send me whatever you actually use to run jobs. Screenshots of the spreadsheet are perfect. Do not tidy anything up.
Operations Teardown for Trade ContractorsNouman Sadiq
Starting at$500
Duration1 week
Tags
Software Architect
Ninety minutes on how your operation actually runs, then a written map of it. No build starts without one.
WHAT WE COVER
How a job comes in. How an estimate gets made and who chases it. How the crew learns today's work. How subcontractors and materials get tracked against a job. How an invoice goes out and gets paid. And the one thing that would make next Monday easier.
WHAT YOU GET, WITHIN 48 HOURS
Your operation drawn on a single page. Three leaks named specifically, each with a clearly reasoned range for what it plausibly costs you. The system design: what gets built, in what order, and what each phase does. A fixed price to close it.
Yours to keep either way. If you go ahead with the build, the $500 comes off the price.
WHY IT EXISTS
Unclear requirements, not slow development, is the one thing that has ever made a build of mine run long. So I do not start one without this. The document is the product, and it is also, word for word, the build spec.
BEFORE WE START
Send me whatever you actually use to run jobs. Screenshots of the spreadsheet are perfect. Do not tidy anything up.