High Converting Full-Stack Website
Starting at
$
1,000
About this service
Summary
What's included
Full Web Design and Development
Here’s a list of potential deliverables for a fully custom website with unlimited amendments to the design, to be completed and live within 2 weeks: Week 1: Planning & Design Phase Initial Consultation & Requirements Gathering (Day 1-2): Meet with the client to discuss their vision, goals, and functionality needs. Gather any content, branding assets (logos, colors, fonts), and images. Site Map and Wireframes (Day 2-3): Create a detailed site map to outline all pages. Develop wireframes to provide a visual structure for each page. Present wireframes to the client for feedback and revisions. Design Concepts (Day 3-5): Create high-fidelity design mockups for key pages (home page, service/product pages, etc.). Present mockups to the client and incorporate any revisions. Unlimited amendments as required until the client is satisfied with the design. Mobile and Tablet Responsive Designs (Day 5-7): Ensure designs are responsive across all devices. Present responsive views to the client for approval or amendments. Week 2: Development & Launch Phase Website Development (Day 8-10): Start coding the custom website based on the approved designs (HTML/CSS/JavaScript or relevant CMS platform). Integrate custom functionality as required (e.g., booking forms, e-commerce, CRM, etc.). Ensure all pages are optimized for speed and SEO. Content Integration (Day 10-11): Populate the website with client-provided content (text, images, videos). Add any necessary calls-to-action (CTAs), contact forms, and links. Testing & Quality Assurance (Day 11-12): Test the website across different browsers (Chrome, Firefox, Safari) and devices. Check for functionality, responsiveness, and performance issues. Implement client feedback with unlimited amendments. SEO Setup & Final Adjustments (Day 12-13): Basic on-page SEO setup (meta descriptions, alt tags, URL structure). Make any last-minute design or functionality tweaks based on client requests. Launch Preparation (Day 14): Set up hosting and domain (if required). Run a final pre-launch check to ensure everything is ready. Launch the website and provide any post-launch support. Ongoing Deliverables: Unlimited Post-launch Design Amendments (As needed): Continue making adjustments to the design after the website is live until the client is completely satisfied.
Duration
2 weeks
Skills and tools
Work with me